专业英语翻译 有会的帮帮忙啊 谢谢阿!Bypassing—If bypassing of the flow is required aroundthe sections of pipe designated for reconstruction, the bypassshould be made by plugging the line at a point upstream of thepipe to be reconstru

来源:学生作业帮助网 编辑:作业帮 时间:2024/11/08 22:44:46

专业英语翻译 有会的帮帮忙啊 谢谢阿!Bypassing—If bypassing of the flow is required aroundthe sections of pipe designated for reconstruction, the bypassshould be made by plugging the line at a point upstream of thepipe to be reconstru
专业英语翻译 有会的帮帮忙啊 谢谢阿!
Bypassing—If bypassing of the flow is required around
the sections of pipe designated for reconstruction, the bypass
should be made by plugging the line at a point upstream of the
pipe to be reconstructed and pumping the flow to a downstream
point or adjacent system. The pump and bypass lines should be
of adequate capacity and size to handle the flow. Services
within this reach will be temporarily out of service.

专业英语翻译 有会的帮帮忙啊 谢谢阿!Bypassing—If bypassing of the flow is required aroundthe sections of pipe designated for reconstruction, the bypassshould be made by plugging the line at a point upstream of thepipe to be reconstru
绕行—就绕行的流量被要求围绕管的部分指派为重建,旁路将使附近的的插头线在一个点管的上游被重建,抽流向一个下游点或邻的系统.